I’ve dropped the ball on posting for the past few months. It’s not that little has happened — quite the opposite, actually. In fact, it’s been quite interesting to watch the massive quantities of dirt being moved around, the endless parade of heavy equipment, the road being opened up day after day. Here’s a look at the past few weeks on Hawkes Avenue:
Water pipes being extended up Hawkes from the building site – 5/29/2018
A big hole starts to form – 5/25/2018
The hole is bigger and it looks like some concrete form works have been installed. 6/9/2018
As always, a great post. I drive by the site almost every day, it looks progressively miserable.
LikeLike